[Gate-users] How do you synchronize a moving detector (SPECT) with a source (Proton Beam)?
Kurt V
kurtv1 at hotmail.com
Mon Sep 11 18:52:14 CEST 2017
How do you synchronize a moving detector (SPECT) with a source (Proton Beam)?
I’m creating a simulation using a proton beam and a SPECT moving detector system.
When I run the simulation, the SPECT detector moves for the correct amount of time and then stops.
Then the proton beam starts after the SPECT system has stopped moving.
Then the particle tracks are displayed after these two systems have already run.
Does anyone know how to synchronize these systems to run at the same time??
(Visualizing with OGLSX).
Thank you very much,
Kurt W. Van Delinder
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.opengatecollaboration.org/pipermail/gate-users/attachments/20170911/1a7aed52/attachment.html>
More information about the Gate-users
mailing list