Hello Theo,
  Be careful 5 simulations with an activity of 2 Bq is not equivalent to
one run with 10Bq. The time difference between two events is
proportional to 1/A so the digitizer will have different effects on a
small and a high activity.
The way to split your simulation is to keep a constant activity and
divide the simulation with time, for instance:
job1:
/gate/application/setTimeStart 0 s
/gate/application/setTimeStop 0.25 s

job2:
/gate/application/setTimeStart 0.25 s
/gate/application/setTimeStop 0.5 s

and so on until 1s.
You will end up with different output files that you should add before
your final analysis. If you use the root ouput, I have a root program
(that Dirk has written, thanks to Dirk who give it to me) that I can
send you if you want).
Bye
sophie

On Thu, 2004-11-04 at 11:05, Mutanga Theodore wrote:
> Hello there,
> 
> Since no one has answered most of my previous posts, I have been thinking
> about the problem i have...
> 
> About splitting a simulation by activity, I was thinking that if for
> instance i have a big simulation with source of activity 10 Bq, and I want
> to split the simulation to say five simulations.
> For the five simulations, can I write five different macros, where in each
> the source definitions would be
>     /gate/source/NAME/setActivity 2 Bq   ?
> 
> And then use
>            qsub <pbs_submitfile1>
>            qsub <pbs_submitfile2>
>            ...
>            qsub <pbs_submitfile5>
> 
> ( or a while loop can implement this)
> 
> where the submitfiles scripts, contains SOURCE ENV_GATE.CSH for setting up
> the environmental variables needed to run GATe, and the paths to all
> required files to run GATE, GateMaterials.db etc.
> 
> About submitting the job(s) there is no problem, I have found out how to
> do that by preparing the pbs submitfile scripts.
> 
> I just want to get some clarification on the way I have split the
> simulations does it look reasonable ? If so do I just merge all the output
> files (say all the *.root , *.S )at the end of the jobs to generate the
> root  output and Sinogram output, respectively,  for example  from which I
> can reconstruct an image ?
> 
> 
> Thanks for your kind attention , waiting for your asnwers
> 
> Theo
> _______________________________________________
> gate-users mailing list
> gate-users at lphe1pet1.epfl.ch
> http://lphe1pet1.epfl.ch/mailman/listinfo/gate-users



More information about the Gate-users mailing list